Sort By : Name | Recent

Show : 12 | 24 | 60 | 120

Trent Basin

When complete Trent Basin will comprise around 300 low-energy apartments and family homes designed around traffic-calmed roads and community spaces. The site’s waterside character will be reflected by tall canal-style houses and the regeneration of features such as a large... View Project

Glenboig Village

The Glenboig Village project has the potential to provide a huge economic boost for North Lanarkshire, representing a £200 million investment, whilst facilitating an estimated 700 jobs – with firms in the local area encouraged to join the supply chain.... View Project

60 Water Street

The design is a direct response to the building’s location. Situated at the sloping junctions of old, waterfront merchant streets and sliced overhead by the Brooklyn Bridge, the site itself is a reflection of Dumbo’s condition – an imperfect pattern... View Project

Staromestska, Bratislava

Responding to the local urban context, whilst maximising floor plate efficiencies, the scheme will accommodate either a single occupant or multiple tenants. The proposal takes the form of an urban infill which completes the missing corner of a city block – a... View Project

Cranleigh School Teaching Building

The project will bring several additional benefits: the creative incorporation of an old structure within the new is both economical and sustainable; by providing new teaching space the project will allow boarding houses converted to classrooms to be returned to their original... View Project

Better Barnsley

The proposed scheme includes a new public open space (the Market Square), a significant extension and refurbishment of the market, a new public library, refurbishment of the Metropolitan Centre, high quality parking and a series of retail and commercial units... View Project

Queen V: English-style gastropub in Moscow

Oleg Klodt has recently completed the transformation of a grand, Stalinist-era 1950s building into Queen V, an English-style gastropub located in the heart of Moscow. Following the brief to combine the character of a British pub with a restaurant serving... View Project

Market Road Football Pavillion

The high profile scheme was delivered by Lincolnshire based LK2 for London Borough of Islington Council – in a bid to provide new fit for purpose facilities. The new facilities have already had a huge impact on the community, preventing... View Project

One Parkside

An existing 12-storey building will be replaced with two residential towers of 16 and 20 storeys, delivering 198 new private for sale properties which will help finance new Council homes for social renting and shared ownership being built on the... View Project

Asons Solicitors headquarters

The £5 million project, designed by Bolton-based architects Bradshaw Gass & Hope, has been heralded as an exciting, future office space that will help to bring Bolton’s town centre into a new era of modern architecture and commercial redevelopment. The... View Project

Fort Kinnaird Shopping Park

At the popular Fort Kinnaird Shopping Park in Edinburgh, which houses over 70 big brand stores, ISG has commenced a project to create over 10,000 sq ft of additional space at an existing retail unit. The contractor will install a... View Project

Creekside Wharf

249 high quality homes Repairs to the dilapidated creek wall including intertidal terracing to promote native flora and fauna Open space and public realm across 72 percent of the site (just 28 percent of the site’s footprint will be built... View Project

Saltdean Lido

The Saltdean Lido Community Interest Company (CIC) has been awarded a first-round development grant by the Heritage Lottery Fund (HLF) towards development of a detailed proposal for Round 2 funding, to bring this heritage Lido building back into use. Saltdean Lido is... View Project

Doddington Hall

£30 million project to restore the Grade l listed Doddington Hall, its surrounding Grade ll listed stables, Grade II listed park and gardens has been granted. The scheme will provide a five star country house hotel and spa near Nantwich,... View Project

Manchester Metropolitan University’s (MMU) School of Theatre

Work is underway to convert Manchester’s iconic Cornerhouse building into the temporary home of Manchester Metropolitan University’s (MMU) School of Theatre. Preston-based architectural and planning consultancy, Cassidy + Ashton, has designed the refurbishment scheme and successfully secured change of use... View Project

Black Cultural Archives, Brixton

Zaha Hadid, the world-famous architect behind the London Aquatic Centre and the Serpentine Sackler Gallery collected the award for New Londoner of the Year for her contributions to the London design industry through her work, both in the UK and... View Project

Acoustic Shells, Littlehampton

The Acoustic Shells by Flanagan Lawrence, won in international competition, were commissioned by Littlehampton Town Council with the aim of revitalising the town’s seafront – part of an inspired initiative that includes the East Beach Cafe by Thomas Heatherwick , the West... View Project

Glasgow Fort car park extension

Appointed as main contractor, McLaughlin & Harvey’s Glasgow office will deliver a steel framed multi-storey car park creating 601 new car-parking spaces along with four restaurant units at the destination leisure facility. The new car park, which will bring total... View Project

20 Fenchurch Street

Themographic surveys: using the same technology as fire and rescue search teams, the thermal conductivity of the entire facade was checked and found to conform with exacting heat loss performance standards. UK’s largest green wall: providing a much-needed plant and... View Project

Staffordshire business park

Work is now underway on Alstom’s new automation facility at the county council developed Redhill business park in Stafford. This followed the announcement that a high quality industrial unit will be built on two more plots at the site. The... View Project

Southampton Hotel, Bouygues UK

The scheme will include an 85-bedroom spa hotel and 12 apartments; built on a headland that was used to moor the region’s exclusive yachts and the cross-channel ferries coming into the marina at Ocean Village. This will be Bouygues UK’s... View Project

Taberner House Croydon

The council’s newly-launched development company is to take control of the Taberner House scheme, providing more affordable housing, more open space and a better financial return. This will be the development company’s first major scheme, which will provide 418 homes,... View Project

South Bank Central

The scheme is due to complete by the end of 2016 and will comprise approximately 235,000 sq ft net office space and 45,000 sq ft gross retail space. tp bennett’s role will be to take the two components of the... View Project

Peab Stockholm Office

The contract covers about 45,000 square meters of office space to gain new spatial distribution and densification, all new installations and more. Adelcrantzska Palace, is part of the office complex, to be restored in its entirety. Work has begun and... View Project

South Glasgow University Hospital

The project, managed and technically led from Glasgow, involved the provision of civil & structural engineering, fire engineering, sustainability and geo-environmental services, with a workforce of 100 working across 13 different locations to deliver the world-class facility on time and... View Project

‘The Bower’ ISG

Delivered by ISG’s Reading-based project team, the scheme involves major structural alterations to reconfigure, modernise and extend the 1980s era building, creating circa 137,000 sq ft of Grade A, BREEAM Excellent rated office accommodation. In addition to improving the aesthetics,... View Project

Michael Uren Biomedical Engineering Research Hub

The 13-storey scheme will provide flexible accommodation for translational research initiatives at the interface of biomedical sciences and engineering. It will house research laboratories, an outpatient clinic, a 150-seat auditorium and a series of social spaces to encourage informal exchange of ideas.... View Project

Selby Leisure Village

The Selby Leisure Village project sees ISG construct a circa 13,000 sq ft steel frame building next to the recently opened Selby Leisure Centre. Facilities include ten pin bowling, adventure play area, indoor aerial trekking, adventure climbing and an indoor... View Project

Monklands Hospital ICU

The £19 million project will see GRAHAM Construction, the main contractor, build a state-of-the-art 10- bed ICU next to the main building, which will be linked to the hospital’s current operating theatres. Once the new unit is constructed it will create... View Project

Hemsedal Alpin Lodge 2

The project consists of a five-story building at the foot of the mountain in Hemsedal, and will in total include approximately 13,700 square meters. In addition to 100 apartments, the building will also include a restaurant area, shop premises, ski... View Project

Holywell Centre, Shoreditch

Located on Phipp Street, just off Great Eastern Street, in the heart of the Bishopsgate area, Holywell Business Centre provides office and studio units approximately 600 metres north of Liverpool Street station (Central, Hammersmith & City, Circle, Metropolitan and mainline... View Project

Mapleton Crescent, Wandsworth

The new homes will be provided within a 25 storey building on a disused site on Mapleton Crescent, Wandsworth Town centre. The development will also provide 23 properties for sale on the open market, as well as indoor and outdoor... View Project

Knowsley Footbridge

Designed by Mouchel, the new bridge will replace the old structure on the same site and will provide a footpath and cycleway on a single symmetrical cable-stayed deck structure, which will be supported on the existing abutments. The project is... View Project

Balance Street, Uttoxeter

Designed to complement the existing streetscape, the two main apartment blocks will draw inspiration from their Georgian neighbours, balancing traditional styling with modern comforts such as fuel efficient boilers. The homes, which are currently under construction, occupy the derelict site... View Project

Majestic Court, South Wolfe Street, Stoke

Property developers have overhauled two floors of a former office building in Stoke-on-Trent to provide student accommodation. Majestic Court, in South Wolfe Street, Stoke, has been converted into 28 self-contained studio... View Project

Cardiff Central Station

The new interchange will be relocated closer to the Cardiff Central train station, allowing greater integration with rail and other transport networks. The new design focusses on legibility and ease of access with the aim of transforming the area into... View Project

Sobell Leisure Centre, Islington

Sobell Leisure Centre is situated in the heart of the London Borough of Islington, just minutes away from Arsenal’s Emirates Stadium. The centre boasts a sports hall, gym, exercise studios, squash courts, and climbing wall. The centre also has the... View Project

Hotel Norge, Bergen

Scandic will take over the hotel on September 1, 2016 and subsequently begin the renovation, which will be carried out in close cooperation with the property owner and take into account the hotel’s history and uniqueness. The hotel will remain... View Project

The University of Manchester, The Whitworth

A £15 million development has transformed the gallery, doubling it in size and creating new spaces that embrace the park it calls home. Yet although the Whitworth is about to open a new chapter in its history, the organisation itself... View Project

The Paddocks, Kelsall

The site is situated in a sought after location in Cheshire – Kelsall. The site is within walking distance of the village with a range of amenities including two churches, primary school, community centre, a local store (Co-op), a butchers... View Project

Pennine Grange

When it comes to choosing an appropriate location for the Heritage Collection, the ancient capital of the Kingdom of Mercia couldn’t be more appropriate. The town of Tamworth shares both Redrow’s sense of history and their flair for modern living, with something... View Project

New RIBA HQ

The new RIBA offices are reworked from what was previsouly the Institute of Physics, a 1950’s building. Theis + Khan were the chosen architects, envisioning a sustainable, sociable and flexible environment with a strong and contemporary identity that embraces new... View Project

Woodfield Place, Altrincham

On the edge of open countryside, yet remaining within easy reach of the heart of Manchester with excellent transport links, you really can enjoy the best of both worlds in Altrincham. This is a truly enviable location with something for... View Project

Silvertown Way, London

The Mayor has announced the selection of a development partner from the London Development Panel to create a high-quality Private Rented Sector (PRS) scheme as part of a sustainable community in the Canning Town and Custom House, a regeneration area... View Project

Liberty Park

Overnight on the 27th of June, work began to lift the beams into place across the West Coast Mainline which will provide the deck for the access bridge into Liberty Park, which lies just off the A38. Next Saturday July 4,... View Project