TORMAX Upgrades Access to Nottingham University Sports Village

Working directly with Nottingham University, TORMAX recently completed a new automatic entrance into the David Ross Sports Village. This popular facility experiences high levels of pedestrian traffic so TORMAX recommended their robust, technologically advanced iMotion 2202.A door drives to automate... View Article

Vectaire at Silverstone

All sizes (EVO220, EVO250 and EVO350) of Vectaire’s EVO horizontal, in-line MVHRs have been installed in the prestigious Escapade accommodation at Silverstone – the UK’s only Formula 1 Circuit. The EVOs provide optimum ventilation by continuously and quietly supplying fresh... View Article

Securing Health for the community at Leamington Spa

An over-demand for health services within the Lillington community in Leamington Spa prompted the development of a new two-storey health centre, which integrates primary care services alongside a range of community health teams. A requirement to meet Secured By Design... View Article

How do fire doors work?

Fire doors play a crucial role in the overall fire safety strategy of a building. They are designed to delay the spread of fire and smoke, providing vital protection for both occupants and property. Understanding how fire doors work is... View Article

Advanced Provides Fire Protection to Eribé Knitwear

Fire protection solutions manufacturer, Advanced, has supplied an intelligent fire panel with wireless detection to iconic Scottish knitwear brand Eribé. An Advanced MxPro 5 analogue addressable fire panel has been installed at Eribé Knitwear to provide industry-leading protection that is... View Article

London Leonardo Hotel Upgrades Meeting Room Flexibility

Situated alongside St Paul’s Cathedral, the Leonardo Royal Hotel London St Paul’s recently added flexibility to two of their high-spec meeting rooms. Working with architects, Cunningham McLean, and Edgewater Contracts, partitioning expert Style was contracted to install three glazed Stylefold... View Article