Cre8 Barn

http://www.veoliatrust.org/cre8/cre8-barn/

The design & build project, led by Passivhaus firm Green Building Store, is transforming the draughty barn into the ultra efficient ‘Cre8 Barn’ centre. A super-insulated timber frame structure has been built inside the existing Victorian stone building, preserving the outward appearance of the barn, whilst aiming for the ultra low energy Passivhaus retrofit (EnerPHit*) standard.

Project Location