Canary Wharf (Crossrail)

http://www.crossrail.co.uk/route/stations/canary-wharf/

The station design incorporates two parts – a huge 256 metre long station box sitting directly below a proposed oversite development.

The oversite development includes plans for 100,000 square feet of retail space and a roof-top park and community facility, semi-covered by an elegant timber lattice roof. The proposed roof will be made of translucent materials, letting the local community see, and encouraging them to visit, the new green space, shops, restaurants and facilities within.

The combined station and oversite development has been likened to a ship moored in the dock, reflecting Canary Wharf’s past as the centre for global maritime commerce and its future, better integrated with the local community and the rest of London.

Access from Canary Wharf at ground level will be via bridge links developed as part of the station development. From North Quay ground level access will be completed with the construction of the North Quay development. This will enable a direct link to the existing Aspen Way footbridge and from there to the DLR station and Poplar High Street.

Project Location