Construction of a Sewage Pumping Station is no easy task and is fraught with difficulties. Often the design contains a selection of chambers, some deeper than others and with very little in terms of design tolerance.
Completing the main wet well benching can prove to be especially difficult. A task which is paramount to the performance of the pumping station, efficient direction of solid matter contained within the pumped medium and prevention of settlement, yet in a confined and often damp and overcrowded environment.
With innovative thinking and a specific focus to the benefits that off-site manufacturing brings, traditional methods of construction are often replaced and improved upon.
TT Pumps Ready Sump with demonstration pumps in place.
Introducing the T-T Ready Sump range of pre-formed concrete chamber sump / base units.
With most options readily available from stock, the T-T Ready Sump range of pre-formed chamber bases make good economic sense and can be ordered at the same time as the concrete rings for speedy construction. Available also in a variety of formats (standalone sump, sump with pre-cast base, sump cast into a concrete ring plus base), many builders and ground-workers have enjoyed the benefits of using the Ready Sump bases for their inbuilt accuracy and ease of installation.
Installing a T-T Ready Sump base equally reduces health and safety risks on site as the need for further man entry into the sump zone to complete the benching is removed.
Designed predominantly for Pumping Stations installations to adoptable grades (Sewers for Adoption and Design Construction Guidance specifications), the T-T Ready Sump is just another example of T-T’s desire to innovate and improve what can be a very tricky and cumbersome process to master.
For all your pumping station needs, contact the experts.