Resiblock have once again been specified as the paving sealer solution for Glasgow Airport. Having initially been applied to over 7,800m² in 2015, Resiblock, and the Resiblock ‘22’ product, are back again to seal an area of 1,400m².
Following initial installation in 2015, the Airport’s passenger traffic had increased to a peak of 9.9 million passengers per year. As such, AGS were keen to ensure that the Concrete Bock Paving at Glasgow Airport continued to be protected with Resiblock, following its success at coping with the increase in passenger traffic.
Resiblock ‘22’ will now continue to prevent paver destabilisation through jointing loss, from factors such as increased footfall traffic, rotary downwash from jet engines and vehicular traffic.