£40 million accommodation project, Hinkley Point C Nuclear Power Station

This vast £40 million, 38,000 sq m, impressive range of buildings will house all the management and technical personnel required during the scheduled 10 year construction stage of this much needed new nuclear power plant.

Almost 1000 steel framed modules will be constructed ‘off site’ at Premier’s state-of- the-art manufacturing facility in East Yorkshire, before being transported to the HPC Site for final assembly and fitting out – a process that will take only 16 months from manufacture to hand over.